翻訳と辞書 |
British Westinghouse Electric and Manufacturing Co Ltd v Underground Electric Rlys Co of London Ltd : ウィキペディア英語版 | British Westinghouse Electric and Manufacturing Co Ltd v Underground Electric Rlys Co of London Ltd
''British Westinghouse Electric and Manufacturing Co Ltd v Underground Electric Railways Co of London Ltd'' () AC 673 is an English contract law case, concerning the duty to mitigate one's loss after a breach of contract. ==Facts== The defendants (British Westinghouse Electric and Manufacturing Co Ltd) supplied the plaintiffs (Underground Electric Railways Co of London Ltd) with turbines which, in breach of contract, were deficient in power. The plaintiffs accepted and used the turbines but reserved their right to claim damages. Later they replaced the turbines with others which were far more efficient than those supplied by the defendants would have been, even if they had complied with the contract. The plaintiffs claimed to recover the cost of the substitute turbines as damages.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「British Westinghouse Electric and Manufacturing Co Ltd v Underground Electric Rlys Co of London Ltd」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|